Foxtrot is committed to meeting the increasing energy requirements of Côte d’Ivoire. The duty of the 3G (Fitting French acronym for « Geophysics», « Geology » and « Field ») Department is double:
We expect that each cubic meter of produced oil or gas should – at a minimum – be replaced by new reserves. This Reserves Replacement Ratio (RRR) may be maintained at a higher level by or through:
The team is currently focused on the evaluation of massive data from the Marlin field which began production in October 2015.